Information for Union North Rate Zone Customers
Enbridge Gas Receives Ontario Energy Board Approval for Rate Changes Effective Oct. 1, 2026
Enbridge Gas recently received approval from the Ontario Energy Board (OEB) for rate changes effective Oct. 1, 2026, following the OEB’s Decision and Order issued on Sept. 24, 2026 (EB-2026-0221). These changes were proposed to the OEB earlier this month as part of the Quarterly Rate Adjustment Mechanism (QRAM).
QRAM is the mechanism Enbridge Gas uses to review and adjust our rates to reflect changes in natural gas prices. This is done every three months to reflect ongoing changes in the market price of natural gas and to adjust for the difference between the forecasted price of natural gas and actual price from prior periods.
In addition to updating rates in EGD and Union rate zones in accordance with Enbridge Gas’ Board-approved QRAM methodologies, Oct. 1, 2026 rates will also reflect the following:
- A one-time clearing of the approved 2024 Utility Earnings and Deferral and Variance Account balances (EB-2025-0155).
- The disposition of an Earnings Sharing Mechanism (ESM) amount resulting from 2024 utility earnings exceeding the OEB-approved return on equity threshold.
All changes are reflected in the rates highlighted below.
October 2026 QRAM
Information for Union North Rate Zone Customers
Delivery Rates
The following changes to delivery rates reflect quarterly updates to gas costs (compressor fuel, unaccounted for gas, own use gas and carrying costs of gas in inventory). This can be found on the “Delivery” line of the invoice.
| Approved Delivery Rate Change (cents/m3) | |
|---|---|
| Rate 20 | (0.0016) |
| Rate 100 | (0.0001) |
Rate 01 and Rate 10 Customers
Rate 01 and Rate 10 will also be changing effective Oct. 1, 2026. Customers can find current information on these rates on our website.
Balancing Transaction Fees
Balancing transaction fees will be updated effective Oct. 1, 2026. For current rates, please see the Balancing Services Rider A.
For more information, find the full application (EB-2026-0221) posted on our website.
Important Update on the New Enerline Hub
Enbridge Gas has updated the implementation timeline for the new Enerline Hub and harmonized rates and services. The integrated implementation, previously targeted for the third quarter of 2027, is now planned for the second quarter of 2028.
As planning continues for these initiatives, additional time is needed to coordinate the changes required to modernize systems and processes and support the introduction of harmonized rates and services. This integrated approach will help ensure a smooth transition and seamless experience for customers.
For the latest updates and support, visit the new Enerline webpage or contact your account representative.
Rate and Service Harmonization
To prepare for the 2028 transition to new harmonized rates and services, we encourage customers to attend upcoming webinars in October 2026 and early 2027. The first webinar on new Checkpoint Balancing requirements will be held on October 26, 2026, and will be of particular interest for current Union North or EGD bundled Direct Purchase customers. Further details on how to participate in these webinars will be available through separate email communications.
Annual Emergency Contact Verification & Interruptible Notification System Testing Update
Thank you to all customers who have responded to our Annual Emergency Contact Verification request. We appreciate the time you've taken to review and update your emergency contact information. Please be assured that all updates and changes received are being reviewed and processed accordingly. While individual acknowledgements may not be issued, all submissions received will be updated in our records.
As a reminder, our annual Interruptible Notification System testing exercise is scheduled to take place in October. Once the testing date has been confirmed, a separate communication will be issued to customers who will be participating in the exercise. Maintaining accurate contact information helps ensure important interruption and emergency notifications reach the appropriate individuals when needed.
If you have any questions about the information contained in this newsletter, please contact your account manager.
Sept. 28, 2026
Information for Union South Rate Zone Customers
Enbridge Gas Receives Ontario Energy Board Approval for Rate Changes Effective Oct. 1, 2026
Enbridge Gas recently received approval from the Ontario Energy Board (OEB) for rate changes effective Oct. 1, 2026, following the OEB’s Decision and Order issued on Sept. 24, 2026 (EB-2026-0221). These changes were proposed to the OEB earlier this month as part of the Quarterly Rate Adjustment Mechanism (QRAM).
QRAM is the mechanism Enbridge Gas uses to review and adjust our rates to reflect changes in natural gas prices. This is done every three months to reflect ongoing changes in the market price of natural gas and to adjust for the difference between the forecasted price of natural gas and actual price from prior periods.
In addition to updating rates in EGD and Union rate zones in accordance with Enbridge Gas’ Board-approved QRAM methodologies, Oct. 1, 2026 rates will also reflect the following:
- A one-time clearing of the approved 2024 Utility Earnings and Deferral and Variance Account balances (EB-2025-0155).
- The disposition of an Earnings Sharing Mechanism (ESM) amount resulting from 2024 utility earnings exceeding the OEB-approved return on equity threshold.
All changes are reflected in the rates highlighted below.
October 2026 QRAM
Information for Union South Rate Zone Customers
Utility Sales
| Current Utility Sales (cents/m3) | New Approved Utility Sales (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Gas Commodity Rate | 16.1833 | 15.3548 | (0.8285) |
| Gas - Price Adjustment | 1.2038 | 2.3461 | 1.1423 |
Delivery Rates
The following changes to delivery rates reflect quarterly updates to gas costs (compressor fuel, unaccounted for gas, own use gas and carrying costs of gas in inventory). This can be found on the “Delivery” line of the invoice.
| Approved Delivery Rate Change (cents/m3) | |
|---|---|
| Rate M4 | (0.0097) |
| Rate M5A | (0.0306) |
| Rate M7 | (0.0083) |
| Rate M9 | (0.0072) |
Rate M1 and Rate M2 Customers
Rate M1 and Rate M2 will also be changing effective Oct. 1, 2026. Customers can find current information on these rates on our website.
Balancing Transaction Fees
Balancing transaction fees will be updated effective Oct. 1, 2026. For current rates, please see the Balancing Services Rider A.
For more information, find the full application (EB-2026-0221) posted on our website.
Important Update on the New Enerline Hub
Enbridge Gas has updated the implementation timeline for the new Enerline Hub and harmonized rates and services. The integrated implementation, previously targeted for the third quarter of 2027, is now planned for the second quarter of 2028.
As planning continues for these initiatives, additional time is needed to coordinate the changes required to modernize systems and processes and support the introduction of harmonized rates and services. This integrated approach will help ensure a smooth transition and seamless experience for customers.
For the latest updates and support, visit the new Enerline webpage or contact your account representative.
Annual Emergency Contact Verification & Interruptible Notification System Testing Update
Thank you to all customers who have responded to our Annual Emergency Contact Verification request. We appreciate the time you've taken to review and update your emergency contact information. Please be assured that all updates and changes received are being reviewed and processed accordingly. While individual acknowledgements may not be issued, all submissions received will be updated in our records.
As a reminder, our annual Interruptible Notification System testing exercise is scheduled to take place in October. Once the testing date has been confirmed, a separate communication will be issued to customers who will be participating in the exercise. Maintaining accurate contact information helps ensure important interruption and emergency notifications reach the appropriate individuals when needed.
If you have any questions about the information contained in this newsletter, please contact your account manager.
Sept. 28, 2026
Information for EGD Rate Zone Customers
Enbridge Gas Receives Ontario Energy Board Approval for Rate Changes Effective Oct. 1, 2026
Enbridge Gas recently received approval from the Ontario Energy Board (OEB) for rate changes effective Oct. 1, 2026, following the OEB’s Decision and Order issued on Sept. 24, 2026 (EB-2026-0221). These changes were proposed to the OEB earlier this month as part of the Quarterly Rate Adjustment Mechanism (QRAM).
QRAM is the mechanism Enbridge Gas uses to review and adjust our rates to reflect changes in natural gas prices. This is done every three months to reflect ongoing changes in the market price of natural gas and to adjust for the difference between the forecasted price of natural gas and actual price from prior periods.
In addition to updating rates in EGD and Union rate zones in accordance with Enbridge Gas’ Board-approved QRAM methodologies, Oct. 1, 2026 rates will also reflect the following:
- A one-time clearing of the approved 2024 Utility Earnings and Deferral and Variance Account balances (EB-2025-0155).
- The disposition of an Earnings Sharing Mechanism (ESM) amount resulting from 2024 utility earnings exceeding the OEB-approved return on equity threshold.
All changes are reflected in the rates highlighted below.
October 2026 QRAM
Information for EGD Rate Zone Customers
Utility Sales
| Current Gas Supply Commodity Charge (cents/m3) | New Approved Gas Supply Commodity Charge (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Rate 100 | 10.3284 | 9.5000 | (0.8284) |
| Rate 110 | 10.2605 | 9.4321 | (0.8284) |
| Rate 115 | 10.2605 | 9.4321 | (0.8284) |
| Rate 135 | 10.2688 | 9.4404 | (0.8284) |
| Rate 145 | 10.2647 | 9.4363 | (0.8284) |
| Rate 170 | 10.2605 | 9.4321 | (0.8284) |
| Current Cost Adjustment - Gas Supply Component (cents/m3) | New Approved Cost Adjustment - Gas Supply Component (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Rate 100 | (1.2597) | (0.3707) | 0.8890 |
| Rate 110 | (1.8332) | (0.7460) | 1.0872 |
| Rate 115 | (1.9109) | (0.7968) | 1.1141 |
| Rate 135 | (1.9109) | (0.7968) | 1.1141 |
| Rate 145 | (1.3912) | (0.4567) | 0.9345 |
| Rate 170 | (1.4560) | (0.4991) | 0.9569 |
Transportation Charges
| Current Transportation Charge (cents/m3) | New Approved Transportation Charge (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Transportation to Enbridge | 5.4267 | 5.4818 | 0.0551 |
| Transportation from Dawn | 0.9430 | 0.9430 | 0.0000 |
Delivery Rates
The following changes to delivery rates reflect quarterly updates to gas costs in delivery rates (unaccounted for gas and own use gas). This can be found on the “Delivery” line of the invoice.
| Approved Delivery Rate Change (cents/m3) | |
|---|---|
| Rate 100 | (0.0078) |
| Rate 110 | (0.0085) |
| Rate 115 | (0.0080) |
| Rate 135 | (0.0078) |
| Rate 145 | (0.0094) |
| Rate 170 | (0.0085) |
Load Balancing Charges
The following changes to load balancing rates reflect quarterly updates to gas costs in load balancing rates (carrying costs of gas in inventory). This can be found on the “Load Balancing” line of the invoice.
| Approved Load Balancing Rate Change (cents/m3) | |
|---|---|
| Rate 100 | (0.0846) |
| Rate 110 | (0.0186) |
| Rate 115 | (0.0056) |
| Rate 135 | 0.0000 |
| Rate 145 | (0.0398) |
| Rate 170 | (0.0178) |
Rate 6 will also be changing effective Oct. 1, 2026. Customers can find current information on our website.
For more information, find the full application (EB-2026-0221) posted on our website.
Important Update on the New Enerline Hub
Enbridge Gas has updated the implementation timeline for the new Enerline Hub and harmonized rates and services. The integrated implementation, previously targeted for the third quarter of 2027, is now planned for the second quarter of 2028.
As planning continues for these initiatives, additional time is needed to coordinate the changes required to modernize systems and processes and support the introduction of harmonized rates and services. This integrated approach will help ensure a smooth transition and seamless experience for customers.
For the latest updates and support, visit the new Enerline webpage or contact your account representative.
Rate and Service Harmonization
To prepare for the 2028 transition to new harmonized rates and services, we encourage customers to attend upcoming webinars in October 2026 and early 2027. The first webinar on new Checkpoint Balancing requirements will be held on October 26, 2026, and will be of particular interest for current Union North or EGD bundled Direct Purchase customers. Further details on how to participate in these webinars will be available through separate email communications.
Annual Emergency Contact Verification & Interruptible Notification System Testing Update
Thank you to all customers who have responded to our Annual Emergency Contact Verification request. We appreciate the time you've taken to review and update your emergency contact information. Please be assured that all updates and changes received are being reviewed and processed accordingly. While individual acknowledgements may not be issued, all submissions received will be updated in our records.
As a reminder, our annual Interruptible Notification System testing exercise is scheduled to take place in October. Once the testing date has been confirmed, a separate communication will be issued to customers who will be participating in the exercise. Maintaining accurate contact information helps ensure important interruption and emergency notifications reach the appropriate individuals when needed.
If you have any questions about the information contained in this newsletter, please contact your account manager.
Sept. 28, 2026
Information for Union North Rate Zone Customers
Enbridge Gas Receives Ontario Energy Board Approval for Rate Changes Effective Oct. 1, 2026
Enbridge Gas recently received approval from the Ontario Energy Board (OEB) for rate changes effective Oct. 1, 2026, following the OEB’s Decision and Order issued on Sept. 24, 2026 (EB-2026-0221). These changes were proposed to the OEB earlier this month as part of the Quarterly Rate Adjustment Mechanism (QRAM).
QRAM is the mechanism Enbridge Gas uses to review and adjust our rates to reflect changes in natural gas prices. This is done every three months to reflect ongoing changes in the market price of natural gas and to adjust for the difference between the forecasted price of natural gas and actual price from prior periods.
In addition to updating rates in EGD and Union rate zones in accordance with Enbridge Gas’ Board-approved QRAM methodologies, Oct. 1, 2026 rates will also reflect the following:
- A one-time clearing of the approved 2024 Utility Earnings and Deferral and Variance Account balances (EB-2025-0155).
- The disposition of an Earnings Sharing Mechanism (ESM) amount resulting from 2024 utility earnings exceeding the OEB-approved return on equity threshold.
All changes are reflected in the rates highlighted below.
October 2026 QRAM
Information for Union North Rate Zone Customers
Delivery Rates
The following changes to delivery rates reflect quarterly updates to gas costs (compressor fuel, unaccounted for gas, own use gas and carrying costs of gas in inventory). This can be found on the “Delivery” line of the invoice.
| Approved Delivery Rate Change (cents/m3) | |
|---|---|
| Rate 20 | (0.0016) |
| Rate 100 | (0.0001) |
Rate 01 and Rate 10 Customers
Rate 01 and Rate 10 will also be changing effective Oct. 1, 2026. Customers can find current information on these rates on our website.
Balancing Transaction Fees
Balancing transaction fees will be updated effective Oct. 1, 2026. For current rates, please see the Balancing Services Rider A.
For more information, find the full application (EB-2026-0221) posted on our website.
Important Update on the New Enerline Hub
Enbridge Gas has updated the implementation timeline for the new Enerline Hub and harmonized rates and services. The integrated implementation, previously targeted for the third quarter of 2027, is now planned for the second quarter of 2028.
As planning continues for these initiatives, additional time is needed to coordinate the changes required to modernize systems and processes and support the introduction of harmonized rates and services. This integrated approach will help ensure a smooth transition and seamless experience for customers.
For the latest updates and support, visit the new Enerline webpage or contact your account representative.
Rate and Service Harmonization
To prepare for the 2028 transition to new harmonized rates and services, we encourage customers to attend upcoming webinars in October 2026 and early 2027. The first webinar on new Checkpoint Balancing requirements will be held on October 26, 2026, and will be of particular interest for current Union North or EGD bundled Direct Purchase customers. Further details on how to participate in these webinars will be available through separate email communications.
Annual Emergency Contact Verification & Interruptible Notification System Testing Update
Thank you to all customers who have responded to our Annual Emergency Contact Verification request. We appreciate the time you've taken to review and update your emergency contact information. Please be assured that all updates and changes received are being reviewed and processed accordingly. While individual acknowledgements may not be issued, all submissions received will be updated in our records.
As a reminder, our annual Interruptible Notification System testing exercise is scheduled to take place in October. Once the testing date has been confirmed, a separate communication will be issued to customers who will be participating in the exercise. Maintaining accurate contact information helps ensure important interruption and emergency notifications reach the appropriate individuals when needed.
If you have any questions about the information contained in this newsletter, please contact your account manager.
Sept. 28, 2026
Information for Union South Rate Zone Customers
Enbridge Gas Receives Ontario Energy Board Approval for Rate Changes Effective Oct. 1, 2026
Enbridge Gas recently received approval from the Ontario Energy Board (OEB) for rate changes effective Oct. 1, 2026, following the OEB’s Decision and Order issued on Sept. 24, 2026 (EB-2026-0221). These changes were proposed to the OEB earlier this month as part of the Quarterly Rate Adjustment Mechanism (QRAM).
QRAM is the mechanism Enbridge Gas uses to review and adjust our rates to reflect changes in natural gas prices. This is done every three months to reflect ongoing changes in the market price of natural gas and to adjust for the difference between the forecasted price of natural gas and actual price from prior periods.
In addition to updating rates in EGD and Union rate zones in accordance with Enbridge Gas’ Board-approved QRAM methodologies, Oct. 1, 2026 rates will also reflect the following:
- A one-time clearing of the approved 2024 Utility Earnings and Deferral and Variance Account balances (EB-2025-0155).
- The disposition of an Earnings Sharing Mechanism (ESM) amount resulting from 2024 utility earnings exceeding the OEB-approved return on equity threshold.
All changes are reflected in the rates highlighted below.
October 2026 QRAM
Information for Union South Rate Zone Customers
Utility Sales
| Current Utility Sales (cents/m3) | New Approved Utility Sales (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Gas Commodity Rate | 16.1833 | 15.3548 | (0.8285) |
| Gas - Price Adjustment | 1.2038 | 2.3461 | 1.1423 |
Delivery Rates
The following changes to delivery rates reflect quarterly updates to gas costs (compressor fuel, unaccounted for gas, own use gas and carrying costs of gas in inventory). This can be found on the “Delivery” line of the invoice.
| Approved Delivery Rate Change (cents/m3) | |
|---|---|
| Rate M4 | (0.0097) |
| Rate M5A | (0.0306) |
| Rate M7 | (0.0083) |
| Rate M9 | (0.0072) |
Rate M1 and Rate M2 Customers
Rate M1 and Rate M2 will also be changing effective Oct. 1, 2026. Customers can find current information on these rates on our website.
Balancing Transaction Fees
Balancing transaction fees will be updated effective Oct. 1, 2026. For current rates, please see the Balancing Services Rider A.
For more information, find the full application (EB-2026-0221) posted on our website.
Important Update on the New Enerline Hub
Enbridge Gas has updated the implementation timeline for the new Enerline Hub and harmonized rates and services. The integrated implementation, previously targeted for the third quarter of 2027, is now planned for the second quarter of 2028.
As planning continues for these initiatives, additional time is needed to coordinate the changes required to modernize systems and processes and support the introduction of harmonized rates and services. This integrated approach will help ensure a smooth transition and seamless experience for customers.
For the latest updates and support, visit the new Enerline webpage or contact your account representative.
Annual Emergency Contact Verification & Interruptible Notification System Testing Update
Thank you to all customers who have responded to our Annual Emergency Contact Verification request. We appreciate the time you've taken to review and update your emergency contact information. Please be assured that all updates and changes received are being reviewed and processed accordingly. While individual acknowledgements may not be issued, all submissions received will be updated in our records.
As a reminder, our annual Interruptible Notification System testing exercise is scheduled to take place in October. Once the testing date has been confirmed, a separate communication will be issued to customers who will be participating in the exercise. Maintaining accurate contact information helps ensure important interruption and emergency notifications reach the appropriate individuals when needed.
If you have any questions about the information contained in this newsletter, please contact your account manager.
Sept. 28, 2026
Information for EGD Rate Zone Customers
Enbridge Gas Receives Ontario Energy Board Approval for Rate Changes Effective Oct. 1, 2026
Enbridge Gas recently received approval from the Ontario Energy Board (OEB) for rate changes effective Oct. 1, 2026, following the OEB’s Decision and Order issued on Sept. 24, 2026 (EB-2026-0221). These changes were proposed to the OEB earlier this month as part of the Quarterly Rate Adjustment Mechanism (QRAM).
QRAM is the mechanism Enbridge Gas uses to review and adjust our rates to reflect changes in natural gas prices. This is done every three months to reflect ongoing changes in the market price of natural gas and to adjust for the difference between the forecasted price of natural gas and actual price from prior periods.
In addition to updating rates in EGD and Union rate zones in accordance with Enbridge Gas’ Board-approved QRAM methodologies, Oct. 1, 2026 rates will also reflect the following:
- A one-time clearing of the approved 2024 Utility Earnings and Deferral and Variance Account balances (EB-2025-0155).
- The disposition of an Earnings Sharing Mechanism (ESM) amount resulting from 2024 utility earnings exceeding the OEB-approved return on equity threshold.
All changes are reflected in the rates highlighted below.
October 2026 QRAM
Information for EGD Rate Zone Customers
Utility Sales
| Current Gas Supply Commodity Charge (cents/m3) | New Approved Gas Supply Commodity Charge (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Rate 100 | 10.3284 | 9.5000 | (0.8284) |
| Rate 110 | 10.2605 | 9.4321 | (0.8284) |
| Rate 115 | 10.2605 | 9.4321 | (0.8284) |
| Rate 135 | 10.2688 | 9.4404 | (0.8284) |
| Rate 145 | 10.2647 | 9.4363 | (0.8284) |
| Rate 170 | 10.2605 | 9.4321 | (0.8284) |
| Current Cost Adjustment - Gas Supply Component (cents/m3) | New Approved Cost Adjustment - Gas Supply Component (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Rate 100 | (1.2597) | (0.3707) | 0.8890 |
| Rate 110 | (1.8332) | (0.7460) | 1.0872 |
| Rate 115 | (1.9109) | (0.7968) | 1.1141 |
| Rate 135 | (1.9109) | (0.7968) | 1.1141 |
| Rate 145 | (1.3912) | (0.4567) | 0.9345 |
| Rate 170 | (1.4560) | (0.4991) | 0.9569 |
Transportation Charges
| Current Transportation Charge (cents/m3) | New Approved Transportation Charge (cents/m3) | Change (cents/m3) | |
|---|---|---|---|
| Transportation to Enbridge | 5.4267 | 5.4818 | 0.0551 |
| Transportation from Dawn | 0.9430 | 0.9430 | 0.0000 |
Delivery Rates
The following changes to delivery rates reflect quarterly updates to gas costs in delivery rates (unaccounted for gas and own use gas). This can be found on the “Delivery” line of the invoice.
| Approved Delivery Rate Change (cents/m3) | |
|---|---|
| Rate 100 | (0.0078) |
| Rate 110 | (0.0085) |
| Rate 115 | (0.0080) |
| Rate 135 | (0.0078) |
| Rate 145 | (0.0094) |
| Rate 170 | (0.0085) |
Load Balancing Charges
The following changes to load balancing rates reflect quarterly updates to gas costs in load balancing rates (carrying costs of gas in inventory). This can be found on the “Load Balancing” line of the invoice.
| Approved Load Balancing Rate Change (cents/m3) | |
|---|---|
| Rate 100 | (0.0846) |
| Rate 110 | (0.0186) |
| Rate 115 | (0.0056) |
| Rate 135 | 0.0000 |
| Rate 145 | (0.0398) |
| Rate 170 | (0.0178) |
Rate 6 will also be changing effective Oct. 1, 2026. Customers can find current information on our website.
For more information, find the full application (EB-2026-0221) posted on our website.
Important Update on the New Enerline Hub
Enbridge Gas has updated the implementation timeline for the new Enerline Hub and harmonized rates and services. The integrated implementation, previously targeted for the third quarter of 2027, is now planned for the second quarter of 2028.
As planning continues for these initiatives, additional time is needed to coordinate the changes required to modernize systems and processes and support the introduction of harmonized rates and services. This integrated approach will help ensure a smooth transition and seamless experience for customers.
For the latest updates and support, visit the new Enerline webpage or contact your account representative.
Rate and Service Harmonization
To prepare for the 2028 transition to new harmonized rates and services, we encourage customers to attend upcoming webinars in October 2026 and early 2027. The first webinar on new Checkpoint Balancing requirements will be held on October 26, 2026, and will be of particular interest for current Union North or EGD bundled Direct Purchase customers. Further details on how to participate in these webinars will be available through separate email communications.
Annual Emergency Contact Verification & Interruptible Notification System Testing Update
Thank you to all customers who have responded to our Annual Emergency Contact Verification request. We appreciate the time you've taken to review and update your emergency contact information. Please be assured that all updates and changes received are being reviewed and processed accordingly. While individual acknowledgements may not be issued, all submissions received will be updated in our records.
As a reminder, our annual Interruptible Notification System testing exercise is scheduled to take place in October. Once the testing date has been confirmed, a separate communication will be issued to customers who will be participating in the exercise. Maintaining accurate contact information helps ensure important interruption and emergency notifications reach the appropriate individuals when needed.
If you have any questions about the information contained in this newsletter, please contact your account manager.
Historical newsletters
- Enbridge Gas files an application for 2025 deferral and variance account clearing
- Verification of contact information
- Service harmonization: preparing for what’s ahead
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2026
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2026
- The new Enerline hub launch update
- 2023 DSM deferral & variance account update – effective July 1, 2026
- Enbridge Gas files an application for 2024 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2026
- Enbridge Gas files an application for 2023 Demand Side Management deferral and variance account clearing
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2025
- Enbridge Gas files 2026 distribution rates application
- Verification of contact information
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2025
- 2023 deferral and variance account clearing update
- The new Enerline: an all-in-one online customer hub
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2025
- Federal carbon charge changes April 1, 2025
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2025
- Enbridge Gas files 2025 Federal Carbon Pricing Program application
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2024
- 2021 Demand Side Management deferral and variance account clearing bill adjustment
- Enbridge Gas files an application for 2022 Demand Side Management deferral and variance account clearing
- Interruption notification system testing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2024
- Enbridge Gas files an application for 2023 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for 2024 distribution rates
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2024
- 2022 deferral and variance account clearing bill adjustments
- Federal carbon charge changes April 1, 2024
- Contract harmonization webinar posted online
- Enbridge Gas files an application for 2025 deferral and variance account clearing
- Verification of contact information
- Service harmonization: preparing for what’s ahead
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2026
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2026
- The new Enerline hub launch update
- 2023 DSM deferral & variance account update – effective July 1, 2026
- Enbridge Gas files an application for 2024 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2026
- Enbridge Gas files an application for 2023 Demand Side Management deferral and variance account clearing
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2025
- Enbridge Gas files 2026 distribution rates application
- South bundled direct purchase checkpoint (Union rate zone only)
- Verification of contact information
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2025
- 2023 deferral and variance account clearing update
- The new Enerline: an all-in-one online customer hub
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2025
- Federal carbon charge changes April 1, 2025
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2025
- Enbridge Gas files 2025 Federal Carbon Pricing Program application
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2024
- 2021 Demand Side Management deferral and variance account clearing bill adjustment
- Enbridge Gas files an application for 2022 Demand Side Management deferral and variance account clearing
- Interruption notification system testing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2024
- Enbridge Gas files an application for 2023 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for 2024 distribution rates
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2024
- 2022 deferral and variance account clearing bill adjustments
- Federal carbon charge changes April 1, 2024
- Contract harmonization webinar posted online
- Enbridge Gas files an application for 2025 deferral and variance account clearing
- Verification of contact information
- Service harmonization: preparing for what’s ahead
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2026
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2026
- The new Enerline hub launch update
- 2023 DSM deferral & variance account update – effective July 1, 2026
- Enbridge Gas files an application for 2024 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2026
- Enbridge Gas files an application for 2023 Demand Side Management deferral and variance account clearing
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2025
- Enbridge Gas files 2026 distribution rates application
- Verification of contact information
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2025
- 2023 deferral and variance account clearing update
- The new Enerline: an all-in-one online customer hub
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2025
- Federal carbon charge changes April 1, 2025
- EGD rate zone billing system harmonization
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2025
- Enbridge Gas files 2025 Federal Carbon Pricing Program application
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2024
- 2021 Demand Side Management deferral and variance account clearing bill adjustment
- Enbridge Gas files an application for 2022 Demand Side Management deferral and variance account clearing
- Interruption notification system testing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2024
- Enbridge Gas files an application for 2023 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for 2024 distribution rates
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2024
- 2022 deferral and variance account clearing bill adjustments
- Federal carbon charge changes April 1, 2024
- Contract harmonization webinar posted online
- Enbridge Gas files an application for 2025 deferral and variance account clearing
- Verification of contact information
- Service harmonization: preparing for what’s ahead
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2026
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2026
- The new Enerline hub launch update
- 2023 DSM deferral & variance account update – effective July 1, 2026
- Enbridge Gas files an application for 2024 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2026
- Enbridge Gas files an application for 2023 Demand Side Management deferral and variance account clearing
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2025
- Enbridge Gas files 2026 distribution rates application
- Verification of contact information
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2025
- 2023 deferral and variance account clearing update
- The new Enerline: an all-in-one online customer hub
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2025
- Federal carbon charge changes April 1, 2025
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2025
- Enbridge Gas files 2025 Federal Carbon Pricing Program application
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2024
- 2021 Demand Side Management deferral and variance account clearing bill adjustment
- Enbridge Gas files an application for 2022 Demand Side Management deferral and variance account clearing
- Interruption notification system testing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2024
- Enbridge Gas files an application for 2023 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for 2024 distribution rates
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2024
- 2022 deferral and variance account clearing bill adjustments
- Federal carbon charge changes April 1, 2024
- Contract harmonization webinar posted online
- Enbridge Gas files an application for 2025 deferral and variance account clearing
- Verification of contact information
- Service harmonization: preparing for what’s ahead
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2026
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2026
- The new Enerline hub launch update
- 2023 DSM deferral & variance account update – effective July 1, 2026
- Enbridge Gas files an application for 2024 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2026
- Enbridge Gas files an application for 2023 Demand Side Management deferral and variance account clearing
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2025
- Enbridge Gas files 2026 distribution rates application
- South bundled direct purchase checkpoint (Union rate zone only)
- Verification of contact information
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2025
- 2023 deferral and variance account clearing update
- The new Enerline: an all-in-one online customer hub
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2025
- Federal carbon charge changes April 1, 2025
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2025
- Enbridge Gas files 2025 Federal Carbon Pricing Program application
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2024
- 2021 Demand Side Management deferral and variance account clearing bill adjustment
- Enbridge Gas files an application for 2022 Demand Side Management deferral and variance account clearing
- Interruption notification system testing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2024
- Enbridge Gas files an application for 2023 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for 2024 distribution rates
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2024
- 2022 deferral and variance account clearing bill adjustments
- Federal carbon charge changes April 1, 2024
- Contract harmonization webinar posted online
- Enbridge Gas files an application for 2025 deferral and variance account clearing
- Verification of contact information
- Service harmonization: preparing for what’s ahead
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2026
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2026
- The new Enerline hub launch update
- 2023 DSM deferral & variance account update – effective July 1, 2026
- Enbridge Gas files an application for 2024 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2026
- Enbridge Gas files an application for 2023 Demand Side Management deferral and variance account clearing
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2025
- Enbridge Gas files 2026 distribution rates application
- Verification of contact information
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2025
- 2023 deferral and variance account clearing update
- The new Enerline: an all-in-one online customer hub
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2025
- Federal carbon charge changes April 1, 2025
- EGD rate zone billing system harmonization
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Jan. 1, 2025
- Enbridge Gas files 2025 Federal Carbon Pricing Program application
- Reminder for customers with an interruptible distribution service
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective Oct. 1, 2024
- 2021 Demand Side Management deferral and variance account clearing bill adjustment
- Enbridge Gas files an application for 2022 Demand Side Management deferral and variance account clearing
- Interruption notification system testing
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective July 1, 2024
- Enbridge Gas files an application for 2023 deferral and variance account clearing
- Enbridge Gas receives Ontario Energy Board approval for 2024 distribution rates
- Enbridge Gas receives Ontario Energy Board approval for rate changes effective April 1, 2024
- 2022 deferral and variance account clearing bill adjustments
- Federal carbon charge changes April 1, 2024
- Contract harmonization webinar posted online