Enbridge Gas Inc. is applying to the Ontario Energy Board (OEB) pursuant to section 38(1) of the Ontario Energy Board Act, 1998 (OEB Act) for an order or orders granting approval to increase the Maximum Operating Pressure (MOP) of its Dawn 156, Bentpath and Rosedale Storage Pools. New infrastructure required for the project includes an injection and withdrawal natural gas storage well at the Rosedale Storage Pool, and approximately 100 m of 10-inch lateral natural gas pipeline, which will be constructed from the new well to the existing Rosedale Storage Pool gathering line. All infrastructure is located in the County of Lambton, the Township of Enniskillen and the Township of Dawn-Euphemia.
The purpose of the project is to meet growing market demand for incremental natural gas storage space and to optimize the injection and withdrawal cycle of the Rosedale Storage Pool.
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service