Situated in Hamilton, between its existing Kirkwall Valve Site, located northeast of the intersection of Safari Road and Valens Road and the existing Hamilton Valve Site, located east of Highway 6 and north of Carlisle Road.
The proposed project would involve the removal of approximately 10.2 km of NPS 48-inch natural gas pipeline will be installed from Enbridge Gas’s Kirkwall Valve Site to its Hamilton Gate Station in the City of Hamilton within a new easement.
The preliminary preferred routing for the Kirkwall to Hamilton segment is to follow a parallel alignment to the existing NPS 26-inch pipeline within a new easement.
The existing NPS 26 Trafalgar natural gas pipeline is a critical component of the Dawn to Parkway System. The replacement will help maintain capacity, safety, and reliability along the Dawn Parkway System.
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service