Cadillac Fairview has requested that Enbridge Gas relocate a portion of its Kipling Oshawa Loop (KOL) natural gas pipeline to accommodate construction of the East Harbour development while maintaining natural gas service to existing customers in Downtown Toronto.

The proposed Enbridge Gas East Harbour Relocation Project will involve the relocation of approximately 400 m of existing 20-inch steel natural gas pipeline between the Enbridge Gas Station B Feeder Station and Lake Shore Boulevard East.

Regulatory approval from the Ontario Energy Board (OEB) is required prior to construction. A Leave to Construct (LTC) application will be filed with the OEB in 2025 and if approved, construction may begin in 2026.

Project status/timeline

  • Feasibility


  • Environmental studies


  • Regulatory review


  • Regulatory approval


  • Under construction


  • In-service