Cadillac Fairview has requested that Enbridge Gas relocate its existing natural gas pipeline to accommodate construction of the East Harbour development while maintaining existing natural gas service to customers in Downtown Toronto that are served by the Kipling Oshawa Loop (KOL) pipeline.
The proposed Enbridge Gas East Harbour Relocation Project will involve the relocation of approximately 400 m of existing 20-inch steel natural gas pipeline between the Enbridge Gas Station B Feeder Station and Lake Shore Boulevard East.
Regulatory approval from the Ontario Energy Board (OEB) is required prior to construction. A Leave to Construct (LTC) application will be filed with the OEB in the Fall of 2023. If approved, construction may begin in Spring 2024.
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service