The proposed project will involve the construction two new natural gas storage wells and approximately 100 to 140 meters of 10-inch steel natural gas pipeline in the Kimball-Colinville Designated Storage Area (DSA). A DSA is an area of land that contains geological formations used for the underground storage of natural gas, as designated by the Ontario Energy Board (OEB) under Section 36.1 (1) (a) of the OEB Act.
The drilling of these wells is needed to replace the deliverability lost in the Kimball-Colinville Storage Pools due to well abandonments. Temporary drill pads and permanent well pads are also required.
The proposed wells and pipeline constructed for this project are required to ensure the continued safe and reliable delivery of natural gas to existing and future Enbridge Gas customers.
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service
Project status/timeline
-
Feasibility
-
Environmental studies
-
Regulatory review
-
Regulatory approval
-
Under construction
-
In-service